Granular borrow
WebMinnesota Department of Transportation - MnDOT Web(2) Under the Select Borrow bid item furnish material conforming to the quality requirements specified in a required Select Borrow contract special provision. 208.2.2 Source (1) Obtain suitable borrow material from one or more of the following sources: 1. Contractor-furnished sources the engineer approves. 2.
Granular borrow
Did you know?
WebApr 1, 2009 · B borrow or structure backfill is required for special filling, the excavated material shall be used as such. If there is a surplus of this material, such surplus shall be used in embankment. The provisions of 203.19 shall apply to placing this material at … WebThe total quantity of Granular Borrow is summarized in cubic meters on the Earthworks Summary Sheet. Quantities shown should include a factor of 1.15 to allow for shrinkage. 203.33 – Rock Borrow. Rock Borrow (in cubic meters) may be specified to improve foundations or to provide slope stability. The total quantity is summarized on the ...
http://bbcutah.com/projects.html WebDefine granular. granular synonyms, granular pronunciation, granular translation, English dictionary definition of granular. adj. 1. Composed or appearing to be composed of granules or grains: granular sugar; granular snow.
WebJan 1, 2024 · 1. Granular Backfill Borrow, Classification A-1. Refer to AASHTO M145. a. Well-graded material. b. Maximum aggregate size is 1½ inches for plastic pipe, 2 inches for all other pipes. 2. Flowable fill. Refer to Section 03575. a. Use only for drainage pipe … Web209 Granular Backfill 209.1 Description (1) This section describes furnishing processed or selected granular materials, where the plans designate, ... If measured in its original position, the department will calculate the quantity as specified for borrow in 208.4.2. Prepare the pit for measurement as specified in 209.2.4.
WebPlace granular borrow behind abutment in 1’-0" layers. Thoroughly compact each layer. Excavated material may be used if suitable. Place two ~9" layers of gravel borrow. Thoroughly compact each layer. Finish to match new cross section, transition with existing approach roadway. 1’-0" L Remove existing deck, superstructure and log abutments ...
WebF:\Truck Body Pricing & Brochures\Excel\Cubic_Yardage_Chart DCubic_Yardage_Chart D Rev A 6/9/2015 AGGREGATE TYPE impulsive gamerWebApr 18, 2024 · A reminder to designers that we should pay for the select granular material used for bridge approach treatments as detailed and noted on the standard plan sheets. This material is paid for as: 2105.507 SELECT GRANULAR BORROW ( ) CU YD and 2105.507 SELECT GRANULAR BORROW MOD 10% ( ) CU YD impulsive force is reduced by increasingWebGranular Borrowing Power Control. In Aave V3, it will be possible to lower the borrowing power of any asset to as low as 0% without any impact on existing borrowers (it’s still possible to use the old approach - liquidating existing users - if … impulsive functionWebgranular: [adjective] consisting of or appearing to consist of granules : grainy. impulsive force definitionWeb1. Measurement: Measurement will be in tons for the quantity of granular stabilization material required to replace unstable subgrade material removed. Measurement will be based on the scale tickets for the material delivered and incorporated into the project. 2. Payment: Payment will be at the unit price per ton for the quantity of granular impulsive groupWeb203.32 granular borrow cy $19.75 26 203.40 shoulder berm removal lf $0.30 42 204.20 trench excavation of earth cy $18.03 110 204.21 trench excavation of rock cy $139.85 59 204.22 trench excavation of earth, exploratory (n.a.b.i.) cy $74.84 278 204.25 structure excavation cy $24.11 99 204.30 granular backfill for structures cy $45.29 136 impulsive gamblerWebgranular borrow s.p. station to station total excavation total embankment include 2629 cu yd of topsoil excavation. embankment (cu yd) common 6862 (ev) = 1315 (cv) 9220 (ev) 1171 (cv) topsoil subgrade 2358 (ev) = 5493 (cv) 878 (cv) topsoil borrow special 1 5278 (cv) suitable grading impulsive games